thermal balance meaning in Chinese
热均衡
热力平衡
热量平衡
热平衡
热天平
Examples
- Comparison of thermal balance course and rl circuit ' s temporary state course
电路暂态过程的比较 - Standard practice for solar simulation for thermal balance testing of spacecraft
航天飞机热平衡试验用太阳模拟规程 - The most frequently occurring parts failures are primarily caused by an inhomogeneous thermal balance of the injection mold
尤其是在注塑领域里,有著很大的可能来分析制件和模具的热学问题。 - Abstract : the oxidation refining method is an effective process to refine the 75 % si - fe alloy . the thermal balance of the process is calculated , which provides the theoretical basis for the possibility of the normal casting of the alloy after being refined
文摘:氧化精炼法是硅系合金精炼技术中的一种有效方法.对75硅铁氧化精炼过程的热量平衡问题做了计算,讨论了精炼合金满足正常浇铸的工艺条件 - This experiment include many contents , in a word , that is summer condition experiment , winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment , furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test , calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ) , input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running , the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe , and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season . the results are earth temperature resume fast in the first week when the heat pump runs off
本文测试内容相当多,概括地说就是四个工况的测试,即夏季制冷工况的测试、冬季供热工况的测试、夏?冬过渡季测试和冬?夏过渡季测试;另外在夏季工况的测试中还进行了变流量测试,在冬季工况的测试中还进行了热平衡测试。本文对测试数据进行了处理,计算出了冬(夏)季工况埋管吸(放)热量、热泵空调器供热量(制冷量) 、热泵空调器输入功率、埋管单位管长换热量、供热性能系数(制冷能效比)和平均传热系数等;另外,还比较了热泵运行时地下一二层埋管进出水温度变化情形,得出地下二层埋管换热能力优于地下一层埋管,且换热很稳定;并分析了过渡季地下一二层埋管温度恢复情形,得出热泵系统停机一周内地温恢复特别快。